Page 72 - Y-bearing-units
P. 72

Mounting instructions

        Mounting instructions
        for flanged Y-bearing units

        with a pressed steel housing and
        an eccentric locking collar

        1  Mount any components that are on the
           shaft between the two Y-bearing units.
        2  Place one housing half into position on
           the machine wall with threaded fasteners
           († fig. 1).
        3  With the eccentric locking collar removed,
           slide the Y-bearing onto the shaft and into
           the housing half with the locking device
           facing outwards.
        4  Place the second housing half into position
           over the Y-bearing († fig. 2).
        5  Fit the threaded fasteners (nuts or bolts),
           but do not tighten them.
        6  Mount the other Y-bearing unit at the other
           end of the shaft, following steps 2 through 5.
        7  Tighten the threaded fasteners holding the
           flanged units in place.
        8  Align the shaft in the bearing arrangement
           axially and – if possible – turn it a few times.
        9  Place the eccentric locking collars on the
           inner ring extension of both Y-bearings and
           snug tighten them in the main direction of
           rotation († fig. 3).
        10  Tighten the locking collars to their final
           position using a hook spanner with a stud
           engaging the hole in the circumference of
           the collar († fig. 4).
        11  Tighten the grub screw in the eccentric
           locking collar of both units († fig. 5) to the
           tightening torque indicated in table 1 on
           page 54.



















        70
   67   68   69   70   71   72   73   74   75   76   77